Plinths all built thanks to Ravenscroft Construction and final prep before the dolphins go out on their trail

Submitted by Steve on 17:00, 30th Apr, 2025 | 0

With all of the Dolphin Discovery Trail 2025 dolphins back from the artists at the GSPCA, the locations all lined up and thanks to Ravenscroft Construction the plinths all made the final items are coming together to get them all out on their trail.

Steve Byrne GSPCA Manager said “All of the 62 dolphins now back at the GSPCA having been decorated by the amazing artists, groups and schools and they look incredible.”

Share